Installation process of color steel sandwich panel:

Process 1 When installing the color steel sandwich panel, it is common to transfer the panel, but the transfer is also exquisite. Both ends should be carefully lifted at the same time. This can avoid damaging its surface oxide film. During the of wall panel equipment, lift one plate at a time. Special fixtures should be selected for fixtures. Generally, manufacturers will have such fixtures. The hoisting shall be carried out slowly to avoid some bumps.

Process 2 As for the fixing method of sandwich panel, there are generally two: we can use self tapping screws to pass through the wallboard and fix it directly on the secondary structure of the wall in this way. We can also use self tapping screws through the connector to indirectly connect with the secondary structure of the wall in this way. Generally, the accuracy of curtain wall panel equipment is as follows: its facade straightness is 2mm, and its surface flatness is 3mm. In addition, the straightness of joints is 0.5mm, and the equipment shall be in accordance with the manufacturer's rules.

广东夹芯板

Process 3 Weather resistant glue is also required during loading. This is generally used when fixing some edge closing plates and flashing plates. Pay attention to the tightness when caulking and sealing with weather resistant glue, so as to effectively prevent gas penetration and rainwater leakage.

After loading, check it. Generally, after the completion of color steel sandwich panel curtain wall, we should stop removing the maintenance adhesive tape on the wall panel surface layer by layer from top to bottom, and dismantle the frame layer by layer. When removing the frame, be careful that the wallboard cannot be scratched or bumped. Check and clean some bonding materials and dust, and adhere to the integrity of the whole construction.